JIB · Guide and calculator
Saltwater disposal and water gathering entries
Produced water has to be moved and disposed of. When the operator runs a water gathering system (a pipeline that moves produced water from the wells) and a saltwater disposal (SWD) system that serve several wells, each well is charged every month for the barrels it sent, and each well's partners pay that share on the JIB. The charge is only as good as the volumes behind it, so the entry starts with Production Accounting.
Who does what
Production Accounting
Owns the volumes.
- Pulls water volumes by well: barrels disposed and barrels gathered by pipeline, from meters, haul tickets and allocation
- Verifies them and ties them to the SWD facility and water pipeline meters
- Explains wells with big swings or volumes on shut-in wells
JIB
Owns the entry.
- Applies the rate, or allocates the system's actual costs, by well
- Codes each charge to well name and cost center
- Posts the entry and bills each well's partners on the JIB
Together
Agree on the hand-off.
- A date in the close calendar when verified volumes are final
- One volume file per month, with well name and cost center on every row
- A clear way to flag and correct prior-month volumes
Don't post on unverified volumes. A charge built on preliminary numbers goes straight to partners on the JIB. If the volumes change after billing, every affected partner needs an adjustment the next month.
Two ways to price the charge
Rate per barrel
A set rate per barrel of water disposed, and a separate rate per barrel of water gathered (moved by pipeline), from the agreement or company policy.
- SWD charge = barrels disposed × SWD rate
- Gathering charge = barrels gathered × gathering rate
- Simple, and partners can check it against the agreed rate
- Rates need a review when costs change
Allocate actual cost
The system's actual operating costs for the month, spread to wells by their share of the barrels.
- Charge = system cost × (well barrels ÷ total barrels)
- Charges exactly what the system cost to run
- The cost per barrel swings with costs and volumes
Which method applies depends on the JOA, any facility or gathering agreement, and company policy. The calculator handles either one, separately for SWD and water gathering.
The entry
| Line | Debit | Credit |
|---|---|---|
| Each well's SWD charge, coded to its well name and cost center | LOE – Saltwater disposal | |
| Each well's water gathering charge, coded to its well name and cost center | LOE – Water gathering | |
| The SWD system, for the total charged out | SWD system cost center (recovery) | |
| The water gathering system, for the total charged out | Water gathering system cost center (recovery) |
The well lines go on that month's JIB, so each well's partners are billed their working interest share. Account names vary by company; use your chart of accounts.
SWD and water gathering calculator
Paste the verified volumes from Production Accounting, one row per well and cost center: Well name · Cost center · Company WI · Water disposed (bbl) · Prior-month disposed · Water gathered by pipeline (bbl) · Prior-month gathered · Verified (Y/N). Leave gathered blank for a well whose water is trucked rather than piped.
Saltwater disposal
Water gathering (pipeline)
Charges by well and cost center
| Well / cost center | Disposed bbl | SWD charge | Gathered bbl | Gathering charge | Total | Partners (JIB) | Review |
|---|
Journal entry preview
| Account | Debit | Credit |
|---|
Each debit is the sum of the well lines; post one line per well and cost center so the JIB bills the right partners.
Reviewing the entries
- Volumes are final. Production Accounting has verified them and marked them final for the month.
- Wells tie to the meters. Barrels disposed by well agree to the SWD facility meter, and barrels gathered agree to the water pipeline meter, within your tolerance. A gap means a missing well, a meter issue, or trucked or third-party water to account for.
- Big swings explained. A well whose volume moved sharply from last month has a reason: a workover, a shut-in, a new completion, a meter change.
- Shut-in wells. A shut-in well normally sends no water. If it shows barrels, ask Production Accounting before charging it.
- Right rates, or right cost. The SWD and gathering rates per barrel match the current agreement; or the cost being allocated matches the system's actual costs for the month.
- Right well, right cost center. Lookalike well names are as risky here as anywhere. Every row carries the well name and cost center.
- Piped or trucked. Only barrels that moved through the pipeline carry a gathering charge. A well newly tied into the pipeline this month is on the volume file.
These entries are posted in the "Overhead and recurring charges" phase of the JIB month-end close checklist.
Your data stays in this page: nothing you paste is sent anywhere or saved. The material on this site is general educational information, not legal, accounting or tax advice. Your joint operating agreements, facility and water gathering agreements, and company policies govern. Sample data uses made-up wells and figures.